Haul Road Design Guidelines
Superelevation runout lengths depend on the crossfall change and the design speeds. The larger the change in road alignment, the longer the runout. At Mine XYZ, runout lengths should be applied so that onethird is in the curve and twothirds are on the tangent. The following table outlines the recommended lengths at this mine site.